A second project opens a year after the first one closed. Different problem, same company, same walls. A few weeks into planning, someone on the new team proposes a particular approach — the kind of idea that always sounds promising the first time it is said out loud in a room. Nobody argues with it, because nobody in this room sat through the first project. Work goes into it for a while, until someone half-remembers that this exact approach was tried and dropped the last time around, for reasons that made sense then and would probably still make sense now, if anyone could find them. The notes from that earlier debate do not exist, or exist somewhere nobody still has a password for. The company pays, in effect, to fail at the same thing twice.
Why we build it this way
Most engagements end with a report. The report gets written near the end, for a steering committee, summarising what was built and why it works. It is a reasonable document, and it is also the wrong shape for the job, because by the time it is written, the people writing it are already reconstructing from memory something they should have written down when it happened.
We think the actual deliverable of an engagement is not the system and not the closing report. It is the record of the decisions that produced the system, captured at the moment each one was made — what was tried, what was set aside, and what evidence justified the call. A report written at the end keeps the decisions that worked and quietly drops the ones that did not, because nobody thinks to write down a path they did not take. That is exactly backwards: the rejected paths are often the more valuable half of the record, because they are the half that saves the next team from walking them again.
The paths we rejected are worth writing down for the same reason as the paths we took — somebody, on some later project, is going to wonder about them again.
So we do not wait for handover to write any of this. The record grows the week the decision is made, not the week the engagement ends.
How it works, roughly
Each decision of consequence gets an entry at the point it is made, not a reconstruction afterward. The record, built up over the course of the engagement, holds:
- the options that were actually considered, including the ones set aside
- the reasoning or evidence behind the call, and who made it
- what changed later, and why, on any decision that was revisited
It sits alongside the test set and the running system, inside the company's own boundary, so it travels with the company rather than with us. When a new project starts, or an old call is questioned, the first step is to open this record, not to re-run the original debate from scratch. When someone on the team disagrees with a decision already on file, the record shows exactly what justified it at the time; if new evidence overturns it, the decision changes, and that change becomes a new entry rather than erasing the old one.
A year on, the difference is not that every idea turns out right on the first attempt. It is that an idea which already failed stays failed, instead of getting a second try under a new name on a different project. The next engagement starts from where the last one actually ended, not from zero — and the record that makes that possible never leaves the building.